OUR HISTORY

Consolidated Lifting Equipment L.L.C offers lifting services globally for a variety of projects in the most challenging offshore environments.

Since our establishment, CLE operating principles have been governed by the demands of safety, quality and timely project delivery within budget. This ensures safe, smooth and successful project realization: we never compromise on safety and always deliver what has been promised.

  • Major Overhauling of Offshore Deck Crane at UAE.
    CEC now expanded his arms to international market, we had successfully completed work for major overhauling of offshore deck crane with best quality work and with the time frame. The job includes overhauling of all winches, hyd system, replacement of king post bearings, MPI/NDT tests of all critical areas. Crane was load tested and certified by Bureau Veritas UAE.
  • Refurbishment, Revamping of deck crane at offshore platform.
    This is the first time in India, that a service provider company had successfully executed this job meeting relevant international standards of API. The job includes design of crane boom, fabricated in house, supply and erected in offshore with the help of indigenously fabricated lifting arrangements. Revamping of complete crane, Supply, Erection and Calibration of Load Monitoring System. Major overhauling of Diesel engine. Sand blasting and Painting. The job was certified by third party M/s DNV.
  • Refurbishment, Revamping of Offshore platform deck cranes.
    Another success job which includes dismantling of damaged boom, counterweight, crane cabin etc. Overhauling of engine, replacement of worn out parts, painting of crane. The job was inspected and certified by M/s DNV.
  • Dismantling, rigging, Installation, renovation of pipe line, commissioning of utility air compressors at offshore platform.
    We had jointly worked with M/s Tide Air, an USA based company for installation, commissioning of Utility Air Compressor at offshore platform. The most critical job in this contract was to lift the compressor on deck and move it to the location. We had detailed engineering, designed and fabricate special lifting arrangements which help us to take compressor on the deck without any damage.
  • Design, Fabrication, Supply, Installation and commissioning of OCI injection system for offshore platform.This is new unit to be fabricated first time on design provided by EIL and ONGC. The selection of components of unit meeting the requirement was the most critical job and successfully completed. The unit was supplied at offshore platform by main contractor M/s Dynamic Valves P.Ltd, but due to unfortunate accident at BHN platform this unit was destroyed.
  • Removal of condemned equipment like compressors, engines, turbochargers, generators etc. from various offshore platforms.
    This job includes removal of condemned equipment from various offshore platforms and unloads it to Nhava base. Surface preparation after removal of equipment. The most critical part of the contract was conducting cold cutting method due to hazardous area.
  • Refurbishment, repair and overhauling of lifting equipments like Monorails, Hoists, overhead cranes at various offshore platforms.
    The most challenging job was to develop spares of old models lifting equipment in limited time frame and replace the obsolete systems to the latest technology systems. This was completed successfully meeting relevant standards and certified by third party M/s DNV.
  • Replacement of slew ring assembly and A-frame of deck crane at offshore platform.
    One of the most challenging job since there was no lifting crane available at platform for removal of slew ring and A-frame which weights 9 ton each. Our first priority was to design a lifting arrangement with the limitation of weight, hot jobs at platform since it is near the wellhead. The challenge was completed successfully with no damages or accidents.